Client
Property owner
Sector
Residential
Project Type
Servicing, refurbishment, installation
Products Used
Third-party, MagnaPro, SumpFlushIP, PowerSafe
Onsite Duration
3 days
Location
South West London
INTRODUCTIONWe were asked by the owner of a large private residence in SouthWest London to repair and service its wastewater pumping systems, which comprised one foul, one storm and three groundwater stations. METHODOn inspection one groundwater station was found to be inoperable with its discharge pipework disconnected and the pumps partially dismantled – a complete refurbishment would be required. The previous equipment was completely stripped out and replaced with new pipework and automatic high-head groundwater pumps. The new pumps are controlled by a 10-hour changeover panel which switches the duty and backup pumps periodically to even out wear. The existing battery backup system was also non-functioning so a PowerSafe 3100.CP was ordered and subsequently installed. The other two groundwater stations were fully functioning. They were serviced in accordance with our Schedule of Works. Both the foul and storm water pumping stations needed minor repairs. Neither system was stepping over correctly so the stepping relay in each control panel was replaced. The stepping relay switches the duty and assist pumps after each pump activations so wear on the pumps and contacts even out. The floats on the foul and storm stations were replaced as the cables had hardened. These were wired into new junction boxes which were sealed with gel. Additionally, the storm station’s pump claw seals were replaced so that a good seal was achieved. RESOLUTIONThe straightforward and professional way the work was completed was appreciated by the client and has led to them entering an Edincare Service Agreement for planned preventative maintenance of all the wastewater pumping systems at the property. Additionally, they have asked us to service the pumping systems of an adjacent property. Scheduled servicing will greatly reduce the risk of breakdown and increase the life expectancy of the equipment. The inoperable groundwater station. Pipework was disconnected and the pump’s base can be seen separated from its main body.
The same station following refurbishment.
The stations 10-hour changeover panel.
The PowerSafe battery backup system for the refurbished groundwater station.
The foul station after servicing.
The stepping relays of the foul and storm stations were replaced.
A single pump groundwater station.
|
|