Our website uses cookies to enhance your experience.
By continuing to use our website, you are agreeing to our use of cookies. Necessary cookies are always enabled.
You can read more about our
Cookie Policy
in our Privacy policy
We value your privacy
Strictly Neccessary
Essential cookies enable core website functionality,
such as secure logins and preference settings, without tracking personal activities or collecting data for ads.
They ensure the site's proper operation and legal compliance, remaining always active
Preferences
Preference cookies enhance your browsing by remembering settings like language and regional preferences,
tailoring the site to your needs without tracking activity across other websites
Statistical
Statistics cookies gather anonymous data on site interactions and page visits to help improve functionality,
ensuring a smoother user experience without personally identifying users
Marketing
Marketing cookies track browsing habits across websites to deliver relevant,
tailored ads, enhancing value for publishers and advertisers by focusing on individual preferences.
We were asked to design, supply and commission 18 packaged pumping stations for the basements of nine adjacent new build houses. Each property was to have their own separate foul water and surface water pumping station.
METHOD
• Drawings were sent to the Projects Team and a site meeting set up to discuss the requirements.
• Foul water was to be pumped from the basements and surface water was to be pumped from small external lightwells.
• 1000mm diameter x 1750mm deep chambers were selected from our MagnaPro range for the foul water and SumpFlushProTwins were selected for the surface water.
• In addition to this we were requested to run all discharge pipework from the chambers up to the gravity connection at high level.
RESULT
• 18 pumping stations were supplied.
• Discharge pipework connections were made using electrofusion fittings to the above basement slab level to allow the concrete structural slab to be poured.
• We returned after the basement structure had been completed to connect this pipework to the gravity drainage.
• Finally, all 18 pumping stations were commissioned.
FOCUS ON:
AFTERSALES SUPPORT
After completing all of the pipework and commissioning works, we have installed telemetric monitoring from our Aqua365 range.
We have a service contract in place with the managing agent which will remain in place until each property is sold.
We supplied comprehensive operation and maintenance manuals, including servicing
guidelines to be handed over to the new owners.