Client
NHS
Sector
Public Sector
Project Type
Survey and report
Products Used
Foul water pumping station
Onsite Duration
1 day
Location
London
REQUIREMENTWe were contacted by a drainage company which was experiencing problems with an exisiting pumping station that has recently received a replacement pump. We were asked to attend the site to survey the pumping station, provide METHOD• Our engineers attended site with our 18-tonne combination tanker. RESULT• By attending site with one of our tankers we were able to wash down the pump station and manage fl ow rates whilst the pumps were out of use. |
|