Client
Large south eastern basement company
Sector
Residential
Project Type
Supply and commission a single pump foul water packaged pumping station
Products Used
Magna200Pro (Macerator Model)
Onsite Duration
1 day
Location
Guildford
REQUIREMENTA foul water pumping station was required to link a basement bathroom to the main sewer which ran at a higher level. The system needed to be very cost efficient and installed quickly to avoid any project delays. METHOD• Following a full site survey by an Edincare project coordinator, a Magna200Pro™ (Macerator Model) was chosen. This pumping station not only fulfilled every technical requirement of the brief but also, being a standard system, was immediately available from stock. With the quotation we specified works to be carried out by the client before our arrival on site, including excavation and installation of the tank. RESULTThe system met all technical requirements and works, from concept to commissioning, and were completed by Edincare within the project’s tight time and budget constraints.
|
|