Client
Boutique design-and-build company
Sector
Residential
Project Type
Supply, installation and commissioning of pumping stations for two houses
Products Used
MagnaGrand™ IP & SumpFlushPro™ Twin
Onsite Duration
15 days
Location
Hampstead, London
REQUIREMENTEdincare was asked to provide internal, below ground packaged pumping stations to lift ground, foul, storm and surface water separately to the main sewer from two new properties. Additionally, we were asked to provide full real-time remote monitoring for all pump stations. METHODFollowing a full site survey by an Edincare Project Coordinator, we specified six pumping stations, which would function independently to fulfil all aspects of the brief. With the quotation, we specified works to be carried out by the client before our arrival on site including excavations and construction of precast concrete chambers. On approval, we agreed a works schedule and supplied a site specific Risk Assessment and Method Statement. The pumping stations were installed and commissioned by our engineers in the precast concrete chambers. Each of the six pumping stations were fitted with a telemetric monitoring system. RESULTThe pump stations met all technical requirements and were installed to schedule and budget. The telemetric systems call our 24/7 manned call centre if a pump trips out, high level is reached or there is a loss of power to any of the six stations. Our team then contacts the client using telephone numbers provided.
|
|