Client
Sandwich / Hot food outlet
Sector
Retail
Project Type
Supply and installation
Products Used
Edincare AutoFlushSSTwin™
Onsite Duration
1 day
Location
Norwich City Centre
REQUIREMENTDuring a scheduled service visit to a busy commercial kitchen in Norwich it was noted that the installed waste water pumping system was worn, un-repairable and would need to be replaced. A replacement solution would receive water from three commercial sinks and a dishwasher via an existing greasetrap. As the kitchen would be used throughout the installation it was important to minimise disruption. METHOD• The service engineers ascertained the pumping distances and required flow rates on the initial visit. An Edincare AutoFlushSSTwin™ was specified due to its hygienic and robust stainless steel construction.The twin pump system includes a backup pump in case of main pump failure. As standard the system includes a control panel with visual and audible alarms. • The positions of inlets, vents and electrical connections were modified to integrate with the existing system. • A technical project coordinator liaised with Edincare engineers and the client throughout to avoid disruption and ensure timely completion to a high standard. RESULTThe system met all technical requirements and works, from concept to commissioning, were completed by Edincare within the agreed time frame and budget.
|
|