Client
Prestigious Homes Developer
Sector
Residential
Project Type
Survey, supply, install and commission
Products Used
MagnaGrand IP
Onsite Duration
5 days
Location
London
REQUIREMENTWe were asked to design, supply and install two pumping stations to remove foul water from the basements of two adjacent new build houses. The pumping stations were to be installed into pre-cast concrete chambers METHOD• Edincare carried out a full site survey before providing a full quotation which included the dimensions of the pre-cast concrete sump that the developer would need to construct. RESULT• Edincare provided the complete solution for the client’s needs.
|
|