Client
Main contractor
Sector
Commercial
Project Type
Installation
Products Used
Control panels
Onsite Duration
5 days
Location
London
RequirementA number of control panels were located in public spaces and vulnerable to interference. They controlled foul and ground water pumping stations. We were asked to replace the control panels and enclose the replacements in secure protective housings. Method
Results
|
|