Client
Large supermarket chain
Sector
Commercial
Project Type
Installation of larger diameter rising main at high level
Products Used
Medium density polyethylene (MDPE) pipework with electrofusion fittings
Onsite Duration
5 days
Location
Enfield
REQUIREMENTAn existing 32mm OD MDPE underground pumping main pipe for a large warehouse was to be replaced by a 63mm OD MDPE overground pipe. The route of the new pipework would be at high level and follow existing services. Following installation the existing pump set was to be recommissioned and serviced. METHODAfter a comprehensive site survey by the Edincare projects team, a full specification and quotation was compiled for client approval. Following approval we supplied a site-specific Risk Assessment Method Statement to the client. Edincare carried out all enabling works prior to installation. In total 180m of 63mm OD MDPE pipework was installed. The pipes were joined using electrofusion fittings to ensure reliability and longevity. Installation at over 5m above ground level was carried out by a team of Edincare engineers with working-at-height safety training using a mobile access platform. RESULTThe replacement pipes have a lower friction coefficient resulting in higher discharge rates and a reduced load on the pumps, which will increase their longevity.
|
|