Client
New Build Contractor
Sector
Residential
Project Type
Supply, Install & Commission
Products Used
MagnaPro & SumpFlushProTwin
Onsite Duration
15 days
Location
London
REQUIREMENTWe were asked to design, supply and commission 18 packaged pumping stations for the basements of nine adjacent new build houses. Each property was to have their own separate foul water and surface water pumping station. METHOD• Drawings were sent to the Projects Team and a site meeting set up to discuss the requirements. RESULT• 18 pumping stations were supplied. |
|