Client
Main contractor
Sector
Residential
Project Type
Installation
Products Used
6 MagnaGrandIP
Onsite Duration
9 days
Location
London
REQUIREMENTWe were asked to specify, install and commission two pumping stations to pump foul and surface/ground water from each of three new houses – a total of six pumping stations. Each surface/ground water pumping station would be supplied with an automatic battery backup system. Following commissioning, we were asked to attend a handover meeting with the planning authorities. METHOD• We carried out a site survey to ensure installation would proceed seamlessly and to specify suitable pumps. RESULT• By liaising with the main contractor throughout the work, we facilitated a simpler and more cost effective installation.
|
|