Client
London based property developer
Sector
Residential
Project Type
Specify, supply and install
Products Used
MagnaGrand IP
Onsite Duration
60 days
Location
London
REQUIREMENTWe were asked to plan, specify and install a system of pumping stations to remove foul, storm and ground water separately from the basement of one of London’s largest residential excavations. The pumps would need to be capable of pumping over a 9m head due to the three storey excavation. We would be part of an integrated team of contractors working systematically through the different phases of the build programme. METHOD• Chose specialised pumps to perform to the high specification. RESULT• Throughout the project we have built a close relationship with the client and his team.
|
|