Client
Groundworker
Sector
Residential
Project Type
Installation and commissioning
Products Used
MagnaPro IP
Onsite Duration
5 days
Location
London
REQUIREMENTSTwo foul water and two groundwater pumping stations were required to pump water from a redeveloped house. The property has a two-storey basement so high-head pumps were needed to discharge from pre-cast reinforced concrete chambers that were installed below that level. METHOD• A quotation was raised based on the architectural plans. RESULTS• Edincare design team designed pump stations to meet the design consultant’s specification. |
|