Client
Main contractor
Sector
Commercial
Project Type
Installation
Products Used
MagnaGrandIP
Onsite Duration
3 days
Location
London
REQUIREMENTWe were asked to design, install and commission a large twin-pump pumping station into a pre-existing concrete sump for foul water removal. Prior to our attendance on site, we liaised with the client to ensure works were carried out to our specifications. Additionally, we planned to run electrofusion discharge pipework to the sewer. METHOD• We carried out a site survey to confirm electrical, access cover and discharge manhole requirements. • We oversaw the works to ensure complience with our specification. RESULTS• Liaising directly with the main contractor during every phase of the works, enabled us to provide the best possible foundation for a well-managed installation. This facilitated a simple and cost effective turnkey solution. |
|