Client
Contractor
Sector
Public Sector
Project Type
Commissioning
Products Used
MagnaPro
Onsite Duration
1 day
Location
Lancaster
REQUIREMENTA small packaged pumping station was required to pump foul waste from a newly constructed classroom block. The waste was to be pumped across the site to a local gravity manhole. The system needed to be both cost effective and reliable. METHOD• A quotation was raised based on the project plans. RESULTS• The customer was given a bespoke solution from our range of chambers and pumps. |
|