Our website uses cookies to enhance your experience.
By continuing to use our website, you are agreeing to our use of cookies. Necessary cookies are always enabled.
You can read more about our
Cookie Policy
in our Privacy policy
We value your privacy
Strictly Neccessary
Essential cookies enable core website functionality,
such as secure logins and preference settings, without tracking personal activities or collecting data for ads.
They ensure the site's proper operation and legal compliance, remaining always active
Preferences
Preference cookies enhance your browsing by remembering settings like language and regional preferences,
tailoring the site to your needs without tracking activity across other websites
Statistical
Statistics cookies gather anonymous data on site interactions and page visits to help improve functionality,
ensuring a smoother user experience without personally identifying users
Marketing
Marketing cookies track browsing habits across websites to deliver relevant,
tailored ads, enhancing value for publishers and advertisers by focusing on individual preferences.
A small packaged pumping station was required to pump foul waste from a newly constructed classroom block. The waste was to be pumped across the site to a local gravity manhole. The system needed to be both cost effective and reliable.
METHOD
• A quotation was raised based on the project plans.
• The pumping station was manufactured in our factory and delivered to site for installation by the construction company.
• The pump equipment was stored in our warehouse until required on site in accordance with the contractor’s schedule.
• Following installation, our engineers attended site to commission the pumping station prior to the building’s handover.
RESULTS
• The customer was given a bespoke solution from our range of chambers and pumps.
• Installation of pumping and its commissioning was carried out in accordance with the construction programme.
• Dedicated account management team was assigned to the site.
• The overall solution provided an annual cost saving to the client.
FOCUS ON:
COMMISSIONING
On completion of all civil works, our Service Team will commission a pump system.
All commissionings are carried out by our fully qualified service engineers. Once completed, we provide a detailed report of the works undertaken along with a commissioning certificate confirming the equipment has been tested in accordance with our operating guidelines.