Client
Building aggregates supplier
Sector
Commercial
Project Type
Supply, installation and commissioning
Products Used
Edincare PowerMaster™
Onsite Duration
1 day
Location
London
REQUIREMENTA building aggregates supplier urgently required a replacement for a failing pump station which pumped foul water on one of their temporary sites. Quick supply and installation was necessary to minimise down time and site disruption. Pipework would be required to connect the new pumping station to an exisiting discharge point. METHODAn Edincare PowerMaster™ floor mounted pumping station was selected from our wide range of stock. This turnkey system comes fully assembled from the Edincare warehouse and requires no civil works. Along with all necessary pipework, it was installed and commissioned out of hours by an Edincare team to minimise disruption to the client’s operation. The system is fully automatic and is provided with the control panel for simple worry-free operation. Due to its high quality robust construction and ease of use, it will be re-used by the client on future temporary installations. RESULT• The floor-mounted Edincare PowerMaster™ was available immediately and came fully assembled from the warehouse.
|
|