Client
Main Contractor
Sector
Residential
Project Type
Installation
Products Used
MagnaProIP
Onsite Duration
3 days
Location
London
REQUIREMENTWe were asked to specify, install and commission a pump set to remove surface water from a pre-cast concrete chamber in the basements for two new, luxury residential houses. The pumping station would be remotely monitored by a telemetric system within the control panel. METHOD• We carried out a site survey and specified chamber dimensions and access cover requirements. RESULT• By directly liasing with the main contractor, we ensured the chamber was built to our requirements, for a simpler and more cost effective installation.
|
|